Shenzhen Factory Tour Planning

Prepare a Shenzhen or Dongguan factory visit for PCB assembly, enclosure development, and small-batch hardware production.

Prepare the technical package

  • For PCB assembly, bring Gerbers and drill data, a bill of materials (BOM) with manufacturer part numbers, and placement data (CPL). Add board revision, polarity notes, approved alternatives and a short test specification.
  • For an enclosure, bring a dimensioned drawing and neutral CAD export. Flag critical fits, mounting bosses, visible surfaces, material, finish and color tolerance.
  • Share a reduced package first when needed. Confirm photo permission, attendee names and which line will run on the day.

Inspect three pieces of evidence on the floor

  • Traceability: ask to follow a lot from incoming label through work order and final carton.
  • Test: ask to observe a functional check or inspect a de-identified test record. Record what visual inspection, AOI and functional checks each cover.
  • Quality escape: ask what happens when an item fails, how rework is labeled and what triggers a stop to the next lot.

Close the visit with a pilot gate

  • Write down the revision, quantity, sample approval date and test fixture owner.
  • Agree what records ship with the pilot and who signs off on any substitution.
  • Get the quote, shipment terms and disposition for failed samples in writing before placing the order.

Choose the process you need to see

For PCB assembly, ask how the shop verifies incoming parts, paste printing and first articles. For enclosures, ask how design revisions affect tooling ownership and lead times. Ask which processes are handled by subcontractors.

Confirm the meeting in writing

Get the legal supplier name, address, date, attendee limits and approved areas from your host. Confirm the working language, photography permissions and whether the relevant line will be operating.

Leave with pilot inputs

Request a written process flow, sample lead time, tooling quote if applicable and a pilot acceptance plan. Record who owns each follow-up. Build time for transport between sites into the agenda.